Phil Haigh<p>More model railway progress…</p><p>The branch line sits on top of the helix so I can’t do much of the construction work in place. My strategy (as this area will be installed as two separate baseboards) is to do as much of the electrical work as possible before laying any track. And then to lay most of the track before the boards are installed.</p><p>Here I’ve installed wiring for the uncouplers, and the relay boards that control them, and all the wiring for the points to the accessory controllers. I’ve also got the signalling and block detection boards in place, but not wired to anything yet.</p><p>Still to run the cables for the buttons that activate the uncouplers, all the feeds to the various track blocks, as well as the wiring for points feedback and block occupancy as, again, there’s no way to do this easily once the boards are installed.</p><p><a href="https://mastodonapp.uk/tags/ModelRailway" class="mention hashtag" rel="nofollow noopener" target="_blank">#<span>ModelRailway</span></a> <a href="https://mastodonapp.uk/tags/OOGauge" class="mention hashtag" rel="nofollow noopener" target="_blank">#<span>OOGauge</span></a> <a href="https://mastodonapp.uk/tags/Build" class="mention hashtag" rel="nofollow noopener" target="_blank">#<span>Build</span></a> <a href="https://mastodonapp.uk/tags/Progress" class="mention hashtag" rel="nofollow noopener" target="_blank">#<span>Progress</span></a></p>